Outdoor point-to-point wireless antenna system

Deployment, cutover and field support

Staged, deployed, validated and supported in the field

For SD-WAN & Cellular Failover Deployment, TechRunz combines equipment staging with onsite installation, cutover, validation, troubleshooting, maintenance, refresh work and post-install field support. We can join during planning or take over a live rollout across western markets.

  • Equipment Staging
  • Onsite Installation
  • Cutover & Validation
  • Troubleshooting & Refresh
  • Field Support

New installation: Launching a new rollout? We can stage kits, deploy onsite, commission the technology and document acceptance.

Existing system: Supporting installed technology? We can troubleshoot, replace, refresh, maintain and close out corrective work.

Field deployment • West Coast

SD-WAN & Cellular Failover Deployment

Coordinate branch connectivity hardware, carrier handoffs, antennas, cabling, and validation at the field level.

What this service covers

The scope is translated into a repeatable field package with site-readiness checks, technician instructions, evidence requirements, escalation paths, and a clear definition of done.

TechRunz provides sd-wan & cellular failover deployment across western markets. We can begin with a defined construction or rollout package, or help organize an incomplete scope before field work begins.

Typical scope

  • SD-WAN appliance installation and circuit patching
  • Cellular gateway and antenna placement
  • Primary/failover path testing
  • Device labeling, asset capture, and remote turn-up support

Project deliverables

Useful closeout information is part of the work—not an afterthought.

Circuit and device inventoryPrepared or updated to match the approved scope and actual field conditions.
Physical installation recordPrepared or updated to match the approved scope and actual field conditions.
Failover test evidencePrepared or updated to match the approved scope and actual field conditions.
Remote engineering handoffPrepared or updated to match the approved scope and actual field conditions.

How the work moves forward

A consistent process protects the schedule while leaving room for real site conditions.

Discover

Confirm objectives, locations, constraints, standards, and stakeholders.

Define

Develop the device, pathway, equipment, labor, test, and reporting scope.

Deploy

Coordinate access, materials, technicians, installation, and issue escalation.

Verify

Test the work, resolve exceptions, and deliver practical closeout records.

Where this service fits

The service can stand alone or be combined with related work when that produces a cleaner and more accountable project.

  • Multi-location programs and regional waves
  • Branch refreshes and equipment lifecycle projects
  • Remote engineering with local field execution
  • Repair, replacement, and recurring site changes

Build a clearer scope

Send the site list, drawings, equipment information, or problem description you already have.

Request project guidance

SD-WAN & Cellular Failover Deployment: decisions that change the scope

SD-WAN and cellular failover work coordinates circuits, routers, SIMs, antennas, policy ownership and representative application tests. Connected status alone does not prove sessions survive or recover acceptably.

Cellular antenna infrastructure for SD-WAN backup connectivity
Cellular antenna infrastructure for SD-WAN backup connectivity

What the survey and work plan must resolve

These are the service-specific decisions to document before equipment, labor and acceptance criteria are finalized.

WAN inventory

Map circuits, modems, carriers, SIMs, antennas and intended priority.

Policy boundary

Name the remote team that owns routing, health checks and application policy.

Signal and capacity

Measure cellular quality, throughput and antenna conditions.

Scenario testing

Exercise failure, convergence, application behavior and restoration.

Completion evidence for sd-wan & cellular failover deployment

Closeout connects the work performed to identifiers, locations, tests and a named operational owner. Credentials and sensitive configurations remain in the client-approved repository.

  • Circuit, modem, SIM and antenna records
  • Signal and throughput measurements
  • Failover and recovery timings
  • Application results and remote acceptance
Why is a site survey still needed?

The exact scope depends on existing conditions, access, interfaces and the operating schedule. The survey turns assumptions into measurable field requirements.

What should be available before scheduling?

Provide the location, responsible contacts, drawings or photographs, existing models, desired outcome, constraints and the required completion evidence.

Detailed planning and product-family guides

Use these focused pages to compare options, understand dependencies and prepare for a productive design conversation.