Technician installing and documenting rack equipment

Deployment, cutover and field support

Staged, deployed, validated and supported in the field

For Manufacturing, TechRunz combines equipment staging with onsite installation, cutover, validation, troubleshooting, maintenance, refresh work and post-install field support.

  • Equipment Staging
  • Onsite Installation
  • Cutover & Validation
  • Troubleshooting & Refresh
  • Field Support

New installation:

Existing system:

Industry

Manufacturing

Plant-floor networking that keeps production systems separated from business traffic, installed around shift patterns and planned shutdowns.

A network that production can rely on

Plant floors run equipment with long lifecycles and little tolerance for interruption. A line controller may have been commissioned a decade ago, cannot be patched casually, and must not share a broadcast domain with office traffic. The separation between production and business networks is the design decision everything else follows from.

The physical environment is equally demanding. Enclosures need appropriate ratings, cable paths avoid heat and vibration, and anything on the floor has to tolerate wash-down, dust or electrical noise depending on the process.

Plant-floor work

  • Separated production and business networks with controlled crossings
  • Rated enclosures, industrial switching and appropriate cabling
  • Cell and line connectivity for controllers and machine interfaces
  • Wireless for handhelds and vehicles where cable cannot reach

Plant documentation

Maintenance teams inherit this network, often at three in the morning during a line stoppage.

Segmentation recordProduction and business boundaries, with every permitted crossing listed.
Enclosure and rating detailWhat was installed where, and to which environmental rating.
Cell connectivity mapWhich lines and cells connect through which equipment.
Shutdown work logWhat was completed in each window and what carried over.

Working around production

Nothing touches a running line without an agreed window and a way back.

Scope

Identify production-critical systems and their real constraints.

Separate

Design the boundary between plant and business networks.

Install

Work inside planned shutdowns with a defined rollback point.

Prove

Verify production systems before the line restarts.

Plant types we work in

The constraints change with the process more than with the size of the plant.

  • Discrete manufacturing with cell and line controllers
  • Food and beverage plants with wash-down requirements
  • Process plants with continuous operation and rare shutdowns
  • Assembly operations adding automation to existing lines

Separating plant and business networks?

Send the line inventory and shutdown calendar. We will scope the segmentation design and the work that fits your windows.

Start the conversation